Show TOC

 Changing Document Links

  1. Choose Start of the navigation path Logistics Next navigation step Production Next navigation step Shop floor control Next navigation step Order Next navigation step Change Next navigation step . End of the navigation path

  2. Enter the order number.

  3. Choose .

  4. The document overview appears.

  5. Make the changes.

  6. Choose .

Note Note

If the changed link was generated from master data, the change must be confirmed (confirmation prompt).

Changes of operation numbers are copied into the document links.

When sequences are changed, the links assigned to an operation that is to be changed are reassigned to the order header.

End of the note.