Procedure documentationSetting the Project Status Switch Locate the document in its SAP Library structure

Use

In certain situations (for example, to prevent tests in the QA system from being affected by development work), project administrators need to restrict what work can be done in a project. They can control this with the project status switch as follows:

By default, the project status switches are set to Allowed for all systems.

Prerequisites

Procedure

  1. Choose Project status switch.
  2. The dialog box Project Status Switch: Select Systems appears.

  3. Either select the radio button System and enter your system, or select All configured transport targets. Choose Continue.

The screen Set Project Status Switch appears. Here you can make the following settings for the client or system:

  1. To make the setting, expand the tree structure as required. The icon in front of the text shows you whether the setting is currently Allowed or Forbidden. To change the setting, choose This graphic is explained in the accompanying text.

Note 

If you want to set the project status switch for a system that you are not logged on to, the system displays the appropriate logon screen.

 