Start of Content Area

ACNielsen: Period: Day  Locate the document in its SAP Library structure

Technical name: 0ACN_PER_DD

Use

This info object captures the day of the period in ACNielsen’s standard file formats "A" and "C." The ACNielsen period uses Saturday as the end date for the period reported.

Technical data

Available from Release

BW 2.1C

Note

This info object is scheduled to be discontinued in future releases.

End of Content Area