You use the amount category to represent an interest rate that can be credited to the customer in the closing tasks.
The amount category 105030 (Credit Interest)
supports condition determination.
This section is divided as follows:
Basic Data About Interest Calculation
Specification of the Interest Rate
Specification of a Simplified Interest Rate
Specification of interest rates for tiered calculation, interval calculation, and mixed tiered and interval calculation
Specification of Interest Rates with Predefined Tiers for Complex Condition Determination
Definition of the complex tiers of condition determination
Specification of interest rates for the complex tiers of condition determination
The following fields are always available for editing a condition with the amount category 105030 (Credit Interest)
:
Condition form
Interest calculation method
Interest calendar
Rounding type
Rounding unit
Payment currency
Time unit for the interest rate
Interest calculation
Interest settlement frequency
If you choose the value X (Exponential)
in the Interest Calculation
field, the system displays the Interest Settlement Frequency
field.
The following fields are available if you set the Percentage-Based Reduction
indicator and Amount-Based Reduction
indicator in the dialog structure amount category in Condition Type Customizing of your application:
Reduction of percentage rate
Reduction of amount
Reduction of reference interest rate
Reduction of minimum interest
Reduction of maximum interest
Depending on which rule from the following decision table applies, the system displays different fields.
Rule | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
Condition | |||||||
The | Yes | Yes | No | No | Yes | Yes | Yes |
You have selected a period of use and a determination period on the | No | No | - | - | Yes | Yes | Yes |
The | Yes | No | Yes | No | - | - | - |
The | - | - | - | - | Yes | - | |
The | - | - | - | - | - | Yes | - |
The | - | - | - | - | - | - | Yes |
Action | |||||||
The system displays the fields for specifying a simplified interest rate. | x | x | x | ||||
The system displays the fields for specifying interest rates for tiered, interval, and mixed tiered and interval calculation. | x | x | x | ||||
The system displays fields for defining the complex tiers of condition determination. | x | ||||||
The system displays fields for specifying the interest rates for the complex tiers of condition determination. | x |
Value | Meaning |
---|---|
Yes | Condition applies. |
No | Condition does not apply. |
- | Condition is not relevant for this rule. |
x | Action that the system executes when a certain combination of conditions exists. |
You use the following fields to specify a simplified interest rate:
Tier/interval
Percentage rate
Reference interest rate
Absolute/relative markup/markdown for reference interest rate
Markup/markdown reference interest rate
Minimum interest rate
Maximum interest rate
Formula
The following fields are used to specify interest rates for tiered, interval, and mixed tiered and interval calculation. They are displayed on the table controls Tiered Calculation
, Interval Calculation
, and Mixed Tiered and Interval Calculation
, or Tiers for Condition Determination
.
Tier/interval
Upper/lower limit
Lower/upper limit
Percentage
Percent
Reference interest rate
Absolute/relative markup/markdown for reference interest rate
Markup/markdown reference interest rate
Minimum interest rate
Maximum interest rate
Edit formula
Formula
Definition of the complex tiers of condition determination
The following fields are used to define the complex tiers in condition determination. They are displayed on the table control Complex Tiers for Condition Determination
.
Tiers for condition determination
Amount limit of complex levels for condition determination
Tiered and interval calculation (item)
Condition item (upper and lower limit)
Text for tiered/interval condition item
Specification of interest rates for the complex tiers of condition determination
The following fields are used to specify the interest rates for the complex tiers in condition determination. If you mark a line in the Complex Tiers for Condition Determination
group box and select Detail
, the following additional fields are displayed depending on the value in the Tiered/Interval Calculation
field:
The Tiered/Interval Calculation (Item)
field has the value 0 (no tiered/interval calculation)
.
The systems displays the fields for specifying a simplified interest rate (see above).
The Tiered/Interval Calculation (Item)
field does not have the value 0 (no tiered/interval calculation)
.
The system displays fields for specifying the interest rates for the complex tiers of condition determination (see above).
You can place the fields for amount category 105030 (Credit Interest)
in the following group box:
Credit Interest Group Box