You want to remove a material from a technical object and place it into storage but without updating the hierarchy of the technical object. You can do this with the Business Add-In (BAdI) BADI_CCM_FULLY_EQUI.
You have actively implemented the BAdI BADI_CCM_I_STRCT_CHK.
...
1. Choose Logistics ® Plant Maintenance ® Maintenance of Technical Objects ® Configuration Control ® Installation and Dismantling of Components from the SAP Easy Access screen.
2. If the Dismantle Equipment and Place in Storage screen is not displayed, enter a material without a serial number and choose Enter.
3. Enter the required quantity, a plant, and a storage location.
4. Enter either a reservation or a movement type.
Enter a reference order, if required.
5. Select an event type and a part status on the Notification tab page.
6. If you want to simulate the removal before saving, choose Check. You can display a full screen application log. Choose Application Log to do this.
7. Save your entries.
You may have to activate the forced dismantling to override an error message issued by the system. In this case, choose Forced Installation/Dismantling and confirm the message in the following dialog box.
A forced dismantling is only possible after the simulation of the dismantling has taken place.
● The equipment is removed from a technical object without updating the hierarchy of the technical object.
● If the corresponding Business Add-In is active, a notification is generated or updated.
See also: