Procedure documentationEntering Change Numbers  Locate the document in its SAP Library structure

Procedure

  1. In the Process using screen section, click This graphic is explained in the accompanying text.
  2. The Process using dialog box appears.

  3. Enter a change number and click This graphic is explained in the accompanying text.

The change number is displayed in the Process using screen section. If a key date was previously displayed in the key date field, it is overwritten by the change number's key date.

Result

The fields to be maintained for each object displayed, are ready for input if the object is valid on the key date and you have locked it.

Note

If the Lock indicator column is shown on the overview screen, This graphic is explained in the accompanying text is displayed there, if you have locked an object.

In certain cases (see table below) the system provides input lines beneath the objects that may be displayed in the overview. There you can create new objects.

The system provides input lines if

And, in the context, you have entered

You are on a routing or BOM object overview

The hierarchically superior objects

You are on the Material-BOM assignments or Material-routing assignments overview

One of the objects that you want to link