Make a Multi-Level Copy of an Object (Object Browser)
Prerequisites
If you want to make a multi-level copy of an item, the bill of material to which the copied item will be assigned must already exist. Correspondingly, the same applies if you want to make a multi-level copy of a routing object. For example: If you want to make a multi-level copy of an operation, the routing and sequence to which the copied operation will be assigned, must already exist.
You have selected the
copy range so that the desired object types are included in the multi-level copy. For more information, see Copy Range.Procedure
The system creates the multi-level copy in the worklist. In other words it copies
For example: If you are making a multi-level copy of an operation and the production resources/tools object type is included in the copy range, copy the operation itself and those production resources and tools that belong to it.
Result
The system creates the multi-level copy in the database.