Start of Content Area

Procedure documentation Creating a BOM Header  Locate the document in its SAP Library structure

Prerequisites

You have already created the BOM material whose BOM header you want to create.

Procedure

  1. Call up the screen EWB: BOM header overview. In the context, enter the material, the plant and the BOM usage of the BOM header that you want to create.
  1. Click This graphic is explained in the accompanying text. If the EWB: Process using dialog box appears, you have to enter either a key date or a change number.

The system provides an input line beneath the objects that are displayed in the overview. The system proposes default values in certain columns.

  1. Enter the data for the BOM header to be created in this empty field and choose This graphic is explained in the accompanying text.

Note

You enter lot size ranges for the BOM header in the screen EWB: Overview material BOM assignments. To get there, select Bills of Material ® Material BOM assignments from the EWB: Overview BOM headers screen.

The system then creates the BOM header in your worklist and locks it for other users. You can see this from the This graphic is explained in the accompanying text lock symbol. If you have not entered a BOM alternative for your BOM header, the system automatically generates one.

  1. Save your data.

Result

The system creates the BOM header in the database.