Change Status with Date Validity
Definition
The processing status of an object that was created with reference to a change number, which refers to a
change master record with date validity.Structure
A change status with date validity has purely time-related validity. This extends from its
valid-from date, to the valid-from date of the change status following. If no change status follows, the validity of a change status with date validity is open-ended.Example
You create an item with reference to change number CH1. The valid-from date of change master record CH1 is January 1. The system then generates a change status, CH1, which has an open-ended validity from January 1.
Item Change Status after Processing using Change Number CH1
You change the item with reference to change number CH2. The valid-from date of change master record CH2 is July 1. The system then generates a change status, CH1, which has an open-ended validity from January 1. Change status CH1 is now only valid until June 30.
Item Change Statuses after Processing using Change Number CH2