Object documentation Change Status with Date Validity  Locate the document in its SAP Library structure

Definition

The processing status of an object that was created with reference to a change number, which refers to a change master record with date validity.

Structure

A change status with date validity has purely time-related validity. This extends from its valid-from date, to the valid-from date of the change status following. If no change status follows, the validity of a change status with date validity is open-ended.

Example

You create an item with reference to change number CH1. The valid-from date of change master record CH1 is January 1. The system then generates a change status, CH1, which has an open-ended validity from January 1.

 

Item Change Status after Processing using Change Number CH1

This graphic is explained in the accompanying text

You change the item with reference to change number CH2. The valid-from date of change master record CH2 is July 1. The system then generates a change status, CH1, which has an open-ended validity from January 1. Change status CH1 is now only valid until June 30.

 

Item Change Statuses after Processing using Change Number CH2

This graphic is explained in the accompanying text