Make a Multi-Level Copy of an Object
Prerequisites
To make a multi-level copy of an object, its superior object must already exist in the target structure. For instance, if you want to make a multi-level copy of an item, the bill of material to which the item will be copied must already exist. The same applies if you want to make a multi-level copy of a routing object, for instance an operation In this case the routing and the sequence in which the operation is to copied must already exist.
You have selected the
copy range so that the desired object types are included in the multi-level copy. (To access the copy range, choose .) For more information, see Copy Range or Editing the copy range.Procedure
The EWB: Copy – Target data screen appears.
If you |
Select the Multilevel copy indicator and enter the data |
Want to make a multi-level copy of a routing header |
of the new header |
Want to make a multi-level copy of a header together with material- routing assignment |
of the new header as well as the material that is to be assigned to the new routing |
Want to make a multi-level copy of an operation |
of the new operation as well as the data of the header and the sequence to which the copy of the operation is to be subordinate |
Want to make a multi-level copy of a BOM header |
of the new BOM header |
The system creates the multi-level copy in the worklist. In other words it copies
For example: If you are making a multi-level copy of an operation and the production resources/tools object type is included in the copy range, copy the operation itself and those production resources and tools that belong to it.
Result
The system creates the multi-level copy in the database.