Start of Content Area

This graphic is explained in the accompanying text Example: Validity Window  Locate the document in its SAP Library structure

When you are selecting your worklist, on the Selection Criteria screen you enter the selection period 03/01 to 07/01 (see black triangles in the graphics).

In the Headers overview select header A, which is valid 04/01 to 06/01.

You switch to the Operations overview and enter the key date 05/01 (see second box from top and gray triangle in the graphics).

Header A has six operations (A0-10 to A0-60). The correspondingly labeled blue time arrows in the right-hand graphic show the validity time periods of these operations.

Which operations are displayed in the Operations overview, depends on which validity window you choose (see top box and white triangles in the graphics):

All the operations are displayed, since the validity period of all the operations coincides with the validity window.

 

Operations Overview with Selection Period Validity Window

This graphic is explained in the accompanying text

Operations A0-50 and A0-60 are not displayed in the Operations overview, since their validity period does not coincide with the validity window.

 

Operations Overview with Change Status Validity Window

This graphic is explained in the accompanying text

Only operations A0-10, A0-20 and A0-30 are valid on the key date and are displayed.

 

Operations Overview with Key Date Validity Window

This graphic is explained in the accompanying text