Procedure documentation Calling up the Component Assignments Overview  Locate the document in its SAP Library structure

Prerequisites

You have assigned the same material to the routing and bill of material, whose items you want to assign to operations in the routing.

Procedure

1. Choose Task lists ® Component assignments or Bills of material ® Component assignments. If the Process using dialog box appears, you also have to enter either a key date or a change number.

The Material-routing assignments in worklist dialog box appears.

2. Select a material-routing assignment and click This graphic is explained in the accompanying text.

The Parameters for BOM explosion dialog box appears. The selected material and its plant are displayed.

Note

If you enter a material and header in the context, or select a material-routing assignment in the Material-routing assignments overview, before you carry out step 1, the Parameters for BOM explosion dialog box appears immediately, in other words, without you having to carry out step 2.

3. Enter a BOM application and, if necessary, a BOM usage and alternative BOM. Click This graphic is explained in the accompanying text.

Note

If required you can hide the component assignments or the non-assigned BOM items. To do this use the Filter assigned objects and Filter non-assigned objects radio buttons.

Result

The Component Assignments overview appears, which lists all component assignments. All non-assigned BOM items are also listed.

The material, bill of material and routing you have selected, are displayed in the context.

Note

If you have entered a BOM usage and alternative BOM, this results in certain bills of material being displayed. Otherwise the system determined the bills of material automatically.

You can find further information in the bills of material component (PP-BD-BOM) in Alternative Determination Using the Application.