Start of Content Area

This graphic is explained in the accompanying textExample: Effectivity Type  Locate the document in its SAP Library structure

In engineering change management Customizing, you can create the effectivity parameters shown in Example: Effectivity Parameters. They are used to create the following effectivity types:

The effectivity parameter SERNR ("serial number") is the only parameter assigned to effectivity type S. S is assigned the priority 10. In the graphic, SERNR is assigned the closed interval value 456 - 789.

 

Effectivity Type S

This graphic is explained in the accompanying text

The effectivity parameters SERNR ("serial number") and DATE are assigned to effectivity type SD. SD is assigned the priority 20, which is a higher priority than effectivity type S.

In the graphic, SD is assigned the following values: SERNR is assigned the single value 456 and DATE the open interval value "from 1/1/2005".

Effectivity Type SD

This graphic is explained in the accompanying text

The effectivity parameters SERNR ("serial number") and AIRLINE are assigned to effectivity type SA. SA is assigned the priority 30, which is a higher priority than effectivity types S and SD.

In the graphic, SA is assigned the following values: SERNR is assigned the open interval value "greater than serial number 455" and AIRLINE the single value "BlueAir".

Effectivity Type SA

This graphic is explained in the accompanying text