Function documentation Cumulating Standard Values  Locate the document in its SAP Library structure

Prerequisites

In a routing you must have referenced a reference operation set as a work center operation set. If you want to display the cumulated standard values in the routing, you must have selected Cumulation in routing and order as the cumulation type of the work center operation set.

Note

If you are using a rate routing instead of a normal routing you should count "routing" to mean "rate routing" and "reference operation set" to mean "reference rate routing" in the following steps.

Features

In a material master update and product costing as well as in an order, the standard values in the operations of a reference operation set are automatically cumulated by the system onto the work center operation set. However, if you want to display the cumulated standard values in the routing, you have to trigger the cumulation manually.

Note

The standard value cumulation always takes place on a particular date. In an order it is the routing’s explosion date and in a routing it is the key date. There may, therefore, be differences between the cumulation results in a routing and in an order, for instance, if an operation that is valid on the key date, is invalid on the explosion date.

The system cumulates the standard values as follows, it checks which standard value parameters are used in the work centers for the operations in the reference operation set. The standard value parameters have to be standard value parameters in the work center of the work center operation set at the same time. Otherwise an error occurs. The standard value in a standard value parameter for a work center operation set is equal to the sum of the corresponding standard values in the operations.

Activities

To manually trigger a standard value cumulation in a routing, choose Operation ® Cumulate standard values in the EWB: Operations overview screen.