Start of Content Area

This graphic is explained in the accompanying text Step 2: Objects in the Database  Locate the document in its SAP Library structure

In the Engineering Workbench, proceed as follows:

  1. With change number CH1 you create a series of objects (see CH1 change statuses in the graphic).
  2. With change number CH2 you change sequence 0, operation A30 and BOM header B, as well as its items.
  3. With change number CH3 you change sequence 0, operation A30 and BOM header B, a second time. With this change number you also create operation A10 and PRT F.
  4. With change number CH4 you change operation A30.
  5. You save your worklist.

You can see the objects and their change statuses, that the system then writes to the database, in the graphic.

 

Objects in the Database

This graphic is explained in the accompanying text

In the graphic you can also see (note legend)

You can find further information in Example: Selection Criteria.

You can find further information in Example: Focus Objects.

You can find further information in Example: Selection Period.