Start of Content Area

Process documentation Filling your Worklist with Environment Objects (Date Effectivity)  Locate the document in its SAP Library structure

Purpose

After you have defined the selection criteria and selection range for your worklist and clicked This graphic is explained in the accompanying text, the system fills your worklist in two steps. This process describes the second of the two steps.

Note

The system only uses this process, if your organization uses the Engineering Change Management (LO-ECH) component and uses change master records with date effectivity, to process bills of material and routings for example.

Prerequisites

The system has executed the Filling your Worklist with Focus Objects (Date Effectivity) function, which means that it has determined the focus objects according to your selection criteria and copied the change statuses, valid during the selection period, to your worklist.

Process Flow

  1. The system determines which objects are assigned to the focus objects, in other words, which objects are environment objects
  2. The system does this as described in Environment Object Selection Focus Header, Focus Operation, Focus BOM Header or Focus Item. Which environment objects the system determines depends, therefore, in particular on the focus of your working area.

  3. If the system has copied at least one change status for a focus object to the worklist, it attempts to copy the environment objects for the focus object to the worklist. From the environment objects, each change status is copied that is valid on at least one day within the selection period.

Result

The system filled your worklist. You can now display and process its objects in the Engineering Workbench.