Start of Content Area

Procedure documentation Copying a BOM Header  Locate the document in its SAP Library structure

Use

You use this procedure if you want to copy BOM header without its subordinated or assigned objects (such as item, component assignment and so on).

Prerequisites

The material to which you want to add the BOM header must already exist.

Procedure

  1. Call up the screen EWB: BOM header overview.
  1. Select the BOM header you want to copy.
  1. Click This graphic is explained in the accompanying text. If the EWB: Process using dialog box appears, you have to enter either a key date or a change number.

The EWB: Copy – Target data dialog box appears.

  1. Deselect the Multi-level copy field and enter the material, plant and BOM usage as well as the data for the new BOM header.
  1. Click This graphic is explained in the accompanying text Copy.

The system then creates the copied BOM header in your worklist and locks it for other users. You can see this from the This graphic is explained in the accompanying text lock symbol.

  1. Save your data.

Result

The system creates a copy of the BOM header in the database.