This graphic is explained in the accompanying text Step 7: Environment Objects  Locate the document in its SAP Library structure

After the system has first copied operation A30 (which is the only focus object) from the database to the worklist, it then determines the environment objects (see graphic).

Graphic 2: Environment Objects

This graphic is explained in the accompanying text

The system proceeds in the same way as for the selection of environment objects with date validity. A change status with parameter effectivity is treated in the same way as a change status with date validity, whose validity period overlaps with the selection period.

Even though the change statuses CH1 and CH2 do not fulfill the selection parameter variant, BOM header B along with both change statuses for item B10 are copied to the worklist.

See also:

Example: Selecting Change Statuses with Parameter Effectivity

Step 6: Focus Objects

Focus Objects and Environment Objects

Environment Object Selection (Focus Operation).