This graphic is explained in the accompanying text Selections On Multiple Hierarchical Levels  Locate the document in its SAP Library structure

Select Selection period as the validity window in the Headers overview (see graphic top left).

Proceed as follows:

  1. Select headers A, B and D and go to the Operations overview.
  2. The operations belonging to header A are displayed. The validity window first displays the selection period of your worklist. Then select Change status as the validity window. The validity window then displays the validity period of header A (see graphic).

  3. Select Goto ® Next record.
  4. The operations belonging to header B are displayed. The validity window displays the validity period of header B.

  5. Select Goto ® Next record.
  6. The operations belonging to header D are displayed. The validity window displays the validity period of header D.

     

    Selections On Multiple Hierarchical Levels

    This graphic is explained in the accompanying text

  7. Select operations D0-10 and D0-40 and go to the Production Resources/Tools overview.
  8. The PRTs belonging to operation D0-10 are displayed. The validity window now displays the validity period of operation D0-10.

  9. Select Goto ® Previous record.
  10. The PRTs belonging to operation D0-40 are displayed. The validity window displays the validity period of operation D0-40.

  11. Go back to the Headers overview.

Your selections remain in place. The validity window is reset to Selection period, which means that it once again displays the selection period of your worklist.