Entering content frameProcedure documentation Lead Columns Locate the document in its SAP Library structure

Use

When you enter planning data, and are using multiple lead columns, the R/3 System displays the overall total for all entries in the planning layout. You can also select the following:

The system displays a subtotal for each characteristic of the lead column.

If, for example, there are two lead columns and you choose Total, the system adds up all value fields across the characteristic of the other lead column.

An exception to this are planning layouts with only one lead column. As standard, the R/3 System does not display an overall total. To display the overall total, choose Total

The R/3 System displays a subtotal for the hierarchy nodes to which the selected lead column characteristic belongs. The system also displays an overall total for the top node of the hierarchy. This overall total is comprised of the subtotals of the lower-level nodes.

If the planning layout only contains one lead column, you can choose either No total, Total or Hierarchy.

If the planning layout contains more than one lead column, that is, there are multiple characteristic combinations possible for the lead columns, and you have selected Total for a characteristic, the system displays the subtotals for this characteristic by totaling the other lead column characteristics. The system displays these subtotals in addition to the characteristic combinations.

If you have selected Hierarchy for a characteristic, the system creates subtotals for the selected characteristic. It also adds up these subtotals along the hierarchy to which the characteristic belongs.

Note

You can set the display of subtotals as a default setting when you a define a planner profile during Customizing. You can change this settings for the length of the planning session when you enter the planning data in the application.

Example

You are using a planning layout with two lead columns. Cost center and cost element. The characteristic values of the cost center are: 4711, 4712, 4713. The characteristic values of the cost element are: 400000, 410000, 420000 . In the standard settings, the overview screen appears as follows:

Cost center

Cost element

Planning costs in CO area currency

4711

400000

10

 

410000

20

 

420000

30

4712

400000

40

 

410000

50

 

420000

60

4713

400000

70

 

410000

80

 

420000

90

*Cost center

*Cost element

450

 

The dialog box for setting the lead column display appears as follows:

Lead column

Hierarchy

Total

No total

Cost center

X

Cost element

X

 

If you have already entered values for all characteristics combinations, the planning overview screen appears as follows:

Cost center

Cost element

Value field 1

Value fields 2 etc.

4711

400000

10

410000

20

420000

30

4712

400000

40

410000

50

420000

60

4713

400000

70

410000

80

420000

90

*Cost center

*Cost element

450

 

If you choose Total for the cost center characteristic, the system displays the following:

Cost center

Cost element

Value field

4711

400000

10

 

410000

20

 

420000

30

 

*Cost element

60

4712

400000

40

 

410000

50

 

420000

60

 

*Cost element

150

4713

400000

70

 

410000

80

 

420000

90

 

*Cost element

240

*Cost center

*Cost element

450

 

If you choose No total for the cost center characteristic, and Total for the cost element characteristic, the system displays the following:

 

Cost center

 

Cost element

 

Plan costs CAC

 

Plan costs TC

4711

400000

10

410000

20

420000

30

4712

400000

40

410000

50

420000

60

4713

400000

70

410000

80

420000

90

*Cost center

400000

120

410000

150

420000

180

*Cost element

450

 

A group exists for the cost center characteristic, in which the characteristic values (cost centers) are assigned. The cost center group is structured as follows:

 

KOSTL

KOSTL1

4711

4712

KOSTL2

4713

4713

If you choose Hierarchy for the cost center characteristic, and No total for the cost element characteristic, the system displays the following on the overview screen:

Cost center

Cost element

Value field 1

Value fields 2 etc.

4711

400000

10

410000

20

420000

30

*Cost element

60

4712

400000

40

410000

50

420000

60

*Cost element

150

KOSTL1

*Cost element

210

4713

400000

70

410000

80

420000

90

*Cost element

240

KOSTL2

*Cost element

240

KOSTL

*Cost element

450

 

The overall total is the total of all the subtotals generated by the system for the characteristic for which you have selected Hierarchy or Total.

 

Note

The R/3 System always displays hierarchies bottom-up on the overview screen. The hierarchy levels are indicated in an additional column by a corresponding number of asterisks "*" (zero being the lowest hierarchy level).

Actions

To display subtotals and hierarchies in Customizing, as well as in the application component, choose Settings ® Lead columns.

 

 