Entering content frameFunction documentationCosting of Recursive Structures Locate the document in its SAP Library structure

Use

You can create a cost estimate or execute a costing run for materials and assemblies with recursive structures. Cycles in recursive BOMs are recognized by the system and costed iteratively. Cycles normally occur in the process industries in joint production and processes using production versions.

Features

The materials to be costed are determined automatically by selection and, if applicable, by BOM explosion in the costing run, or by BOM explosion in the material cost estimate with quantity structure. (See also Cost Estimate with Quantity Structure: Process Flow and Costing Run: Concept.)

The system then searches automatically for cycles and assigns them to costing levels. When it does this, the system does not interpret the recursiveness in the BOM, but evaluates the previously-created cost estimates.

Materials in a cycle or between two cycles are costed iteratively. Iteration ends after the convergence criterion "Total amount of all price changes is zero" has been reached. In other words, the price of the in-going material is the same as the price of the costed material.

Prerequisites for a successful cost estimate are as follows:

When no solution exists and the cost estimate does not converge, the system recognizes this and issues an error message.

The number of iterations required increases with proportion of the quantity used and produced of a material within a cycle. For the cost estimate to be successful, this ratio should be less than approximately 0.95.

Example

To produce 100 kg of A, 80 kg of A is used.

The system costs material A.

To produce 100 kg of A, 99 kg of A is used.

The system cannot cost material A and issues an error message.

If overhead is applied to a cyclic material in a cycle, the quantity proportion that is yet to be costed is reduced by the amount of the overhead.

Example

To produce 100 kg of A, 90 kg of A is used. An overhead of 10% is applied to the material costs of A.

The system cannot cost material A and issues an error message.

If a cyclic material is produced as a co-product, the above condition applies as follows: The ratio of the used and produced quantity multiplied by the portion of costs assigned to the material in accordance with the apportionment structure must be lower than approx. 0.95.

Example

To produce 50 kg of A and 200 kg of B, 100 kg of A is used.

The system cannot proceed with costing and issues an error message.

The system can proceed with costing.

Activities

You create a cost estimate with quantity structure or execute a costing run for the materials and assemblies that you want to cost. You do not require special settings in Customizing.

For more information, see Creating the Cost Estimate with quantity Structure and Creating the Costing Run.

See also: