Prerequisites
You have specified in the order type that goods movements take place between the manufacturing levels.
Process Flow
When you create production orders, the system generates a settlement rule automatically for each production order. The settlement rule of each order in the collective order assigns the order costs to the following receivers:
Make-to-stock production |
To the make-to-stock inventory (receiver = material) |
Sales-order-related production with a valuated sales order stock |
To the valuated sales order stock (receiver = material) |
Engineer-to-order with a valuated project stock |
To the valuated project stock (receiver = material) |
Sales-order-related production with a nonvaluated sales order stock |
To the sales order item |
Engineer-to-order with a nonvaluated project stock |
The WBS element |
The goods receipt results in the lower-level order being credited in accordance with the price control defined in the material’s master record. The goods issue results in the higher-level order being debited in accordance with the price control. This means that if the price control indicator of the material is set to S, the credit and debit are at the standard price. If the price control indicator is set to V, the credit and debit are at the price selected in accordance with the valuation variant specified in Customizing for Product Cost by Order under Define Goods Received Valuation for Order Delivery. If the price control indicator is set to V, the actual credit and the actual debit can use the value calculated in the preliminary order cost estimate.
The postings in accordance with the automatic goods movements transfer the complete production costs of each manufacturing level to the corresponding manufacturing order.
If you are using collective orders, you can specify whether you want to view the costs for the order you entered, for a subtree of the collective order, or for the entire collective order, or whether you first want to see an overview of the structure of the collective order and from there go to the cost reports of the individual orders.