Entering content frameCollective Purchase Order: Example of Checking for Existing Stocks Locate the document in its SAP Library structure

This example shows what happens when the system check for existing procurement transactions when generating collective purchase order items. For the sake of simplicity, we’ll look at one issue document only. The example involves a warehouse order with one item and several schedule lines.

Warehouse order

Item

Article

Schedule line

Quantity

Delivery date

Delivery generated on

1 (store 1)

1

Chocolate

1

100

11.10.

09.10.

 

1

Chocolate

2

250

12.10.

10.10.

 

1

Chocolate

3

150

13.10.

11.10.

When the collective purchase order is generated, there is stock on-hand (unrestricted-use stock) and an open vendor order item for the article "chocolate". The order item is to be out away at goods receipt.

Date

Situation/transaction

Qty in transaction

Available qty

05.10. (today)

Stock on-hand

100

100

10.10.

Planned goods receipt for PO

200

300 (total)

A collective purchase order is generated on 05.10. and has the following data:

The system now checks availability on the delivery generation date for each schedule line in the warehouse order item.

Date

Situation/transaction

Qty in transaction

Available qty

Order quantity

05.10. (today)

Stock on-hand

100

100

 

09.10.

Delivery generated for schedule line 1

100

0

0

10.10.

Planned goods receipt for PO

200

200

0

10.10.

Delivery generated for schedule line 2

250

0

50

11.10.

Delivery generated for schedule line 3

150

0

200 (total)

The total quantity of the collective purchase order item is 250.

(This quantity may be divided among several schedule lines in the collective purchase order, depending on the interval between the individual schedule lines.)

 