Entering content frameProcedure documentation Allowing Material Price Determination Locate the document in its SAP Library structure

Procedure

  1. Choose Accounting ® Controlling ® Product Cost Controlling ® Actual Costing/Material Ledger ® Actual Costing ® Edit Costing Run.
  2. Under Process, go to either Single-level or Multilevel material price determination.
  3. Double-click on the padlock symbol to allow material price determination.

Result

For the plant you selected, you can perform single-level and multilevel material price determination as well as closing entries in the period entered.

Note

Note

If you want to perform single-level material price determination when postprocessing outside of the costing run, you can use the following menu path to check whether price determination is allowed:
Accounting
® Controlling ® Product Cost Controlling ® Actual Costing/Material Ledger ® Periodic Material Valuation ® Organizational Measures ® Display Allowed Tasks

See also:

Performing Single-Level Material Price Determination

Performing Multilevel Price Determination

Performing Closing Entries

Leaving content frame