Entering content frameProcedure documentationCreating a Costing Run Locate the document in its SAP Library structure

Procedure

  1. Choose Accounting ® Controlling ® Product Cost Controlling ® Actual Costing/Material Ledger ® Actual Costing ® Edit Costing Run then Costing Run ® Create.
    Alternatively, you can copy an existing costing run. In this case, choose Costing Run® Copy. When you do this, the plants from the costing run being copied are transferred into the new costing run. You can manually change the assignment of plants.
  2. Enter the necessary data and choose Execute.
  3. Under General Data, assign the relevant plants to the costing run.
  4. Save the costing run.

Result

You see a list of the plants that are contained in the costing run plus information telling you which plants can participate and which plants can not participate.

Next, select the materials.

See also:

Performing a Selection