Entering content frameProcess documentation Components in Stock For Make-to-order Production Locate the document in its SAP Library structure

If a component of make-to-order material is kept in stock, ensure that you set secondary requirements indicator 4 (except collective requirements) in the Individual/collective field on the MRP 2 view in the material master record for the component. Otherwise, MRP does not consider stock and only creates independent requirements.

 

 

Leaving content frame