Entering content frameProcess documentation Scheduling in Make-to-Order Production Locate the document in its SAP Library structure

The total replenishment lead time (which is found on the MRP 2 screen in the material master) as well as delivery scheduling form the basis for scheduling orders items for make-to-order production. Unconfirmed order items can be confirmed automatically by updating backorders, when the production dates that prevented the confirmation change. The new, earlier production dates are then copied into the order items.

 

Leaving content frame