Background Processing: Promotion Supply Source Determination
Use
You can use program RWAKT240 to generate a supply source determination for a promotion in background processing.
The functions in program RWAKT240 are the same as transaction WAK5.
Integration
Program RWAKT240 can be run in parallel externally if locks are set at article level.
Prerequisites
The promotion period must not yet have expired.
The promotion must have at least one site group assigned to it.
Features
You can run a supply source determination for a chosen promotion.
You can limit the articles in a promotion for which a supply source determination is run. If you do not select any articles, the supply source determination will run for all the articles in the promotion.
Activities
The program can only be run once for each promotion.
See also:
Subsequent Processing for Promotions