Use
Report that you can use with product drilldown to analyze the individual variance categories for the following application components:
The reporting time frame can be cumulative or limited.
This report makes it possible for you to analyze the results of the variance calculation. The results of variance calculation are different depending on the target cost version specified for the report.
You can compare the following costs:
Structure
Data Displayed
The following variance categories are shown based on key figures and/or original cost elements:
Header Information:
Prerequisites
Make sure that the variances have been calculated for the specific target cost version in the relevant reporting time frame. Reports of summarized analysis require that a data collection run be executed beforehand.
Recommendation
This report is intended as a more detailed analysis for a target / actual / production variances report. You can normally go from product drilldowns to the variance categories report.
See also:
In the documentation for Cost Object Controlling:
Basic information on variance calculation can be found in:
Variance CalculationDetailed information on the individual variance categories can be found in the following:
Variance Categories Scrap VariancesInformation on the target cost versions and their resulting comparison values can be found in the following:
Types of Variance Calculation Target Cost Versions in Variance Calculation Calculation of Target Costs Calculation of Control Costs