Use
For the material cost estimate the costing or MRP view contains the following relevant information for the quantity structure:
The alternative BOM determines which alternative is used as the basis for material costing with a quantity structure for a specific BOM usage.
The BOM usage determines the areas within the company in which the
For automatic alternative determination enter a BOM usage to determine which BOM is to be used for the material costing with quantity structure.
The task list group summarizes several
You can create a new task list group for each routing usage. This enables you to opt for production alternatives in material costing with a quantity structure. Within the task list group, the same group counter identifies the same production alternative.
The group counter identifies which
routing or master recipe within the routing group is used in the material costing with a quantity structure.The task list type identifies a particular task list together with the task list group and the group counter. A task list contains the information for the production of a material. This may involve for example a master recipe (task list type 2), a routing (task list type N) or a rate routing (task list type R).
This key sets a
If you do not enter a key here, the special procurement type you enter in the MRP view will apply.
The costing lot size specifies the quantity used as a basis for costing. If you do not specify a lot size when creating a cost estimate, this lot size is used as a default. If you do specify a lot size when creating a cost estimate, the lot size in the material master record is ignored.
Indicates a material as a
Indicates that production versions exist for the material
Specifies the production version to be used as a basis for costing the material
The following information relevant to the material cost estimate is defined in the MRP view.
See also: