Entering content frameProcedure documentation Settling an Order Locate the document in its SAP Library structure

  1. Choose Logistics ® Production ® Shop floor control ® Period-end closing ® Settlement ® Individual processing.
  2. Enter the number of the production order that you wish to settle.
  3. Enter at least the following data:

You can also enter the following data:

- processing type

- posting period

- asset value date

  1. At this point, you can decide whether to carry out the settlement as a simulation or as an update:
  1. Choose This graphic is explained in the accompanying text.

Note

You can settle a production order any number of times.

 

 

 

 

 

Leaving content frame