When you deliver the material to stock, the system determines the costs of the material produced in the following way:
- If the price control indicator in the material master record is set to S, the delivered quantity is multiplied by the standard price in the material master record of the material produced
- If the price control indicator in the material master record is set to V, the delivered quantity is multiplied by the price defined by the valuation variant
- For more information on how goods movements affect the order costs, refer to