Use
Inspection characteristics are normally copied over from the routing. However, you can also create inspection characteristics in the production order. These are known as ‘unplanned’ inspection characteristics.
Procedure
Call up the production order.
You can only create an inspection characteristic when an inspection lot has been created and saved for the relevant production order.