Entering content frameBackground documentation Overhead Costs Locate the document in its SAP Library structure

Overhead costs are costs which can be assigned only indirectly to the production order, such as electricity costs or general storage costs.

Overhead costs are assigned to the production order via overhead surcharges. They are updated in the order under the cost elements defined in the costing sheet.

A costing variant is defined in customizing per order type and plant. The costing variant refers to a costing sheet. The costing sheet determines what overhead surcharges are assigned to the order.

The costing sheet specifies:

 

 

 

Leaving content frame