Entering content frameBackground documentation Material Costs Locate the document in its SAP Library structure

The materials used in an order can be divided into stock components and non-stock components. You can calculate planned costs for both component categories.

Planned Costs for Components

Planned Costs for Material Manufactured In-House

Planned Costs for Material Procured Externally

 

 

 

 

Leaving content frame