Entering content frameBackground documentation Checking Scope Locate the document in its SAP Library structure

The checking scope specifies

Example

You assign checking group IN to materials produced in-house.

In the checking scope you specify that the system need not check purchase orders or purchase requisitions for materials with the checking group IN, since they are irrelevant to materials produced in-house.

You assign checking group EX to materials produced externally.

In the checking scope, you specify that the system need not check sales or production orders for materials with the checking group EX, since they are irrelevant to materials produced externally.

The settings for the checking scope, however, not only influence the results of the material availability check, they also affect the speed with which the result can be determined.

You define the checking scope in Customizing for Shop Floor Control by choosing Operations ® Availability Check ® Define Scope of Check.

Leaving content frame