Entering content frameConceptual documentation Batch Splits: Requirement Quantities Locate the document in its SAP Library structure

Use

If a component is split into separate batches, you can distribute the required quantity over the individual splits.

To find out information about the requirements situation of a component with batch splits, you first need to branch to the component overview.

Note

You can manually change the original quantity of a component. If you should do so (for example, because you need less of the component than usual), we recommend that you delete any previously assigned requirements quantities and carry out another batch determination.

 

 

 

 

Leaving content frame