Use
You maintain the control key for operations in Customizing for Shop Floor Control, by choosing Master Data ® Routing Data ® Define Control Key.
Schedule
Using the Schedule indicator you can define that an operation is scheduled. If an operation is
External Processing
If an operation is externally processed (relevant setting in the External processing key), you can define how it is scheduled. If the Sched. external op. indicator is
Capacity Requirements
You use the Det. Cap. Reqmnts indicator to determine whether capacity requirements are determined for an operation.