Entering content frameProcedure documentation Starting Scheduling Locate the document in its SAP Library structure

Use

You can start scheduling manually at any time.

If changes relevant to scheduling are made in the order it is given the status NTUP (dates are not updated). In this case, the order is automatically rescheduled when it is saved, if at least one of the following conditions are fulfilled:

Procedure

  1. Call up a production order (only in create or change mode).
  2. Choose This graphic is explained in the accompanying text.

The system schedules the production order and creates a scheduling log.

 

Leaving content frame