Entering content frameProcedure documentation Changing Parallel Sequences Locate the document in its SAP Library structure

If you want to change the text for the sequence, the branch operation or the return operation , proceed as follows:

  1. Choose Goto ® Overviews ® Sequences.
  2. The system lists all the alternative and parallel sequences that already exist in the production order.

  3. Select the parallel sequence that you want to change and choose This graphic is explained in the accompanying text.

The system branches to a screen where you can make the changes.

If you want to change the operations in a sequence proceed as follows:

  1. Choose Goto ® Overviews ® Sequences.
  2. The system lists all the alternative and parallel sequences that already exist in the production order.

  3. Select the parallel sequence that you want to change and choose This graphic is explained in the accompanying text.

The system lists all the operations contained in the sequence.

For more information about maintaining operations refer to Changing Operation Data.

 