Entering content frameProcedure documentation Cumulating Standard Values Locate the document in its SAP Library structure

Prerequisites

If the standard values of the suboperations are to be automatically cumulated to the main operation when you create the production order, you must set the Cumulation type key accordingly in the routing.

Alternatively, you can trigger the cumulation of standard values in the production order. A condition for cumulation is that you have maintained standard values at suboperation level.

Procedure

  1. Choose Logistics ® Production ® Shop Floor Control ® Order ® Change.
  2. Specify the number of the order that you want to change.
  3. Choose This graphic is explained in the accompanying text.

The initial screen for production orders appears. You can see the tab for production order data.

  1. Choose This graphic is explained in the accompanying text.

You reach the operation overview.

  1. Select the operation for which you want to cumulate the standard values.
  2. Choose Operation ® Cumulate standard values

Result

The standard values of the suboperations are added together and written to the standard values of the operation.

 

Leaving content frame