Entering content frameProcedure documentation Creating Production Orders Without a Material Locate the document in its SAP Library structure

  1. Choose Logistics ® Production ® Shop Floor Control ® Order ® Create ® Without material.

You reach the initial screen Create production order.

  1. Enter the following data:
  1. You must also specify the following data:

Note

If you want to create the order with reference to an existing order then the order referenced must also be one without a material.

  1. Choose This graphic is explained in the accompanying text.
  2. The General tab page appears.

  3. Enter the following data:

Note

Production orders are generally scheduled backwards.

If you specify a scheduling margin key the system fills these fields automatically.

If no scheduling margin key has been specified you can specify the float before production, the float after production and the release horizon by specifying the corresponding number of days.

  1. You must also specify the following data:
  1. Choose This graphic is explained in the accompanying text.

You reach a dialog box where you can specify whether you want to use a reference operation set. If you do not want to use a reference operation set then a standard sequence is automatically generated with an operation.

The system searches for a valid routing (see Routing Selection) and a valid bill of material (see Selecting Bills of Material).

Note

If alternative sequences exist in the selected routing, they can only be copied to the production order if alternative sequences are permitted for the order type in Customizing for Shop Floor Control: Choose Master data ® Order ® Define Order Type-Dependent Parameters.

If you do not want to change the operations or add any components, you can now save the production order. Otherwise, change the data and then save the production order.

 

Leaving content frame