Entering content frameProcedure documentation Determining Future Prices (Manually) Locate the document in its SAP Library structure

Procedure

  1. Choose Logistics ® Materials Management ® Valuation ® Material Price Change ® Maintain Future Prices

or

Choose Accounting ® Controlling ® Product Cost Controlling ® Actual Costing/Material Ledger ® Material Ledger ® Set Prices ® Maintain Future Prices

  1. Enter the data for the material for which you want to maintain the future valuation price.
  2. Enter the validity date of the marking.
  3. Choose Manual Individual Maintenance and check the new future price and the respective date. If necessary, change the entries into the respective currencies and valuations.
  4. Maintain the values.
  5. Choose Execute.

Result

The new future valuation prices are updated in all currencies and valuations in the material ledger data and also in the company code currency in the material master record.

If you have activated the actual cost component split, the system generates a predefined standard cost component split during manual price maintenance.

You can release the new future valuation prices. For more information, see Releasing Planned Prices.

 

Caution

You can also manually maintain the future material price in the Accounting 1 view of the material master.

See also:

Determining Future Prices (Automatically)

Leaving content frame