Entering content frameProcedure documentation Processing Reservations Locate the document in its SAP Library structure

Changing Header Data

By selecting Goto ® Header, you can display the header data screen where you can change the base date and the account assignment.

Entering New Items (on Detail Screen)

If you do not want to enter a new item on the Collective processing screen, but rather directly on the detail screen, select Edit ® New item.

Once you have entered the new item, you can display the detail screen for entry of the next new item by selecting Edit ® New item.

Note

If you want to enter all of the items directly on the detail screen instead of on the collective entry screen, you can call the New item function directly from the initial screen. When you do this, you first receive a box in which you enter the account assignment data. Choose Continue to go the detail screen for entry of the first item.

Entering New Items (on Collective Processing Screen)

To enter several new items at once on the collective processing screen, choose Edit ® New items.

Alternatively, you can select Goto ® Collective process.. The collective processing screen appears, and you can enter new items, but the items already entered are also listed. For those items, you cannot change the material number or the plant.

Deleting an Item

If a material no longer needs to be withdrawn, or if you entered an incorrect material number or plant, you can delete the item.

  1. On the collective processing screen, choose the item to be deleted.
  2. Choose Edit ® More functions ® Delete item.

Changing an Item on Detail Screen

To display or change detailed information about an item (for example, its quantity in the various units of measure, or its account assignment), select an item.

On the detail screen, you can change all of the item data (for example, the requirement date). You cannot change the material number or the plant.

Changing Default Values for New Items

You use this function to enter new items for a different requirement date or for another plant.

Choose Edit ® Default values.... A dialog box appears in which you define the new default values.

 

Leaving content frame