Use
You use an upload to transfer confirmation data from the subsystem to R/3. The upload is triggered by the R/3 system.
Features
R/3 sends an upload request to the subsystem, asking it to transfer confirmation records to R/3.
You can set up the system so that either the confirmations are updated automatically after they have been transferred (communication parameters) or the program SAPVBKK2 is scheduled to do the update as a background job.
Scheduling Background Jobs
You have to schedule the following programs for an upload:
Task |
Program |
Menu path |
Upload request |
SAPPPC24 |
Logistics ® Production ® Shop floor control ® Confirmation ® Subsystem ® Upload ® Request PDC upload. |
CC2 update |
SAPVBKK2 |
Logistics ® Production ® Shop floor control ® Confirmation ® Subsystem ® Upload ® Update PDC records. |
You schedule the jobs in Customizing by choosing Cross-Application Components ®
Plant Data Collection ® Production orders (PP, communication channel 2) ® Schedule background jobs for PDC.