Use
You need to download data to the subsystem to carry out checks in the subsystem. Downloading is not necessary for PDC data transfer. The following checks can be carried out at the subsystem level:
Prerequisites
Operations that are to be transferred to the subsystem must be suitable for PDC. This means that,
Features
In the initial download, the operations from the production orders that meet the corresponding conditions, are downloaded from R/3 to the subsystem.
In the master data download the master data is downloaded to the subsystem, so that extensive checks can be carried out there. You can download the following data:
In the delta download all the operations that have been created since the last initial download are transferred to the subsystem.
Scheduling Background Jobs
You have to schedule the following programs for a download:
Task |
Program |
Menu path |
Initial download |
SAPPPC21 |
Logistics ® Production ® Shop floor control ® Confirmation ® Subsystem ® Download ® Initial dowload . |
Master data download |
SAPPPC22 |
Logistics ® Production ® Shop floor control ® Confirmation ® Subsystem ® Download ® Master data download. |
Delta download |
SAPPPC23 |
Logistics ® Production ® Shop floor control ® Confirmation ® Subsystem ® Download ® Delta dowload . |
You schedule the jobs in Customizing by choosing Cross-Application Components ->
Plant Data Collection -> Production orders (PP, communication channel 2) -> Schedule background jobs for PDC.