Entering content frameProcedure documentation Planning Statistical Key Figures By Period Locate the document in its SAP Library structure

You can use the planning layout for statistical key figures to plan the costs for general cost objects with a periodic time base by period: Proceed as follows:

  1. Choose Accounting ® Controlling ® Product Cost Controlling ® Cost Object Controlling ® Intangible Goods and Services ® Planning ® Cost Object - Periodic ® Set Planner Profile.
  2. Enter the desired planner profile (SAP1 or SAP2).
  3. First press User master record and then Continue.

  4. Choose Planning ® Cost Object Periodic ® Statistical Key Figures ® Change.
  5. The screen Periodic Cost Object Planning ® Statistical Key Figures Change: Initial Screen appears.

    Enter the required data:

    – Version: Here you normally enter 0.

  6. Choose ENTER and then Overview screen.
  7. This screen appears: Change Cost Object Planning Statistical Key Figures: Overview Screen. The planning layout determines what cells can be entered or changed. Enter the current planned value, the maximal planned value, and the distribution key.

  8. Choose ENTER .
  9. The system calculates the planned values for your general cost object.
  10. Save your planned values.
  11. To see the planned values for each period, press Period screen.
Leaving content frame