Entering content frameProcedure documentation Creating a Production Process for a Cost Object Hierarchy Locate the document in its SAP Library structure

Prerequisites

A production process may already have been created for one of the following reasons:

Procedure

  1. Choose Accounting ® Controlling ® Product Cost Controlling ® Cost Object Controlling ® Product Cost by Period ® Master Data ® Cost Object Hierarchy ® Edit Production Process.
  2. The screen Display Production Processes appears.

  3. Enter the following data:
  1. Choose Production Process ® Create.
  2. The screen Assign Controlling Level for Material appears.

  3. Choose a Controlling level by positioning the cursor.
  4. Choose Confirm.
  5. The screen Create Production Process appears.

  6. Enter the following data:
  1. Choose Confirm.
  2. Save the production process.

Result

The system has created a production process for the material.

The production process was created in accordance with the Controlling level you selected. This Controlling level is valid for this plant material and can be changed under certain conditions. See also: Editing the Controlling Level

The production process is updated in all product cost collectors and manufacturing orders for this production process. All product cost collectors and manufacturing orders for this production process are automatically assigned to the relevant cost object node.

Leaving content frame