Procedure
The screen Configuration: Initial Screen appears.
The screen Configuration: Characteristic Value Assignment appears.
The dialog box Variant Costing appears.
The dialog box Control Parameters appears.
Result
The screen Variant Costing: Costing Data for Material appears. The system shows you the costing results based on the costing variant you used.
The cost estimate for a variant is only simulated with this function. It is not saved.
See also:
Planned Costs in Variant ProcessingFor information on calculating overhead expenses, both in general and with respect to configuration simulation, refer to the section
Overhead in Sales-Order-Related Production.