Entering content frameProcedure documentation Updating the Preliminary Cost Estimate Locate the document in its SAP Library structure

Prerequisites

Changes have been made to the routing.

Procedure

  1. Choose Accounting ® Controlling ® Product Cost Controlling ® Product Cost by Period ® Planning ® Preliminary Costing for Product Cost Collector
  2. The screen Creation of Preliminary Cost Estimates for Product Cost Collectors appears.

  3. Enter data as required.
  4. Choose Program ® Execute.

Result

The system updates the preliminary cost estimate in accordance with the data you entered in the selection screen.

The reporting point backflushes of the current period are converted.

See also:

For detailed information on conversion with changes reporting point structures, see the following section:

Flexible Reporting Points

For general information on the preliminary costing for product cost collectors, see the following section:

Preliminary Cost Estimates for Product Cost Collectors

 

 

Leaving content frame